Transmission and Distribution: Distribution Line Installation and Removal

4.3 3 Reviews SKU: RVI-11367Duration: 60 Minutes

Sometimes changes are made in the area around a distribution line that make it necessary to relocate or replace a portion of that line. This interactive online course will familiarize you with the general procedures involved in completing a typical distribution line installation and removal.   You will learn how to plane an installation and removal job and how to perform the major steps involved in doing the job. You will also learn how to pull and sag lines, parallel a new line with an existing line, remove conductors, and remove equipment.

Course Details

Specs

Training Time: 60 minutes

Compatibility: Desktop Only

Based on: Industry Standards and Best Practices

Languages: English

Learning Objectives

  • By the end of this course, you will be able to:Identify the equipment used in distribution line installation and removalDescribe the basic safety considerations associated with the four basic tasks of a distribution line installation and removal jobDescribe the procedure for setting a new poleDescribe how to pull in a pilot line, a bull rope, and a conductor Identify the tasks involved in phasing-in an energized lineDescribe how to remove an existing line

Customer Reviews

4/9/2019

Good information but some of the test questions didnt seem to be specific to the info presented

“Good information.”

Darrel S. Verified Customer

2/19/2019

Hope I passed

“Hope I passed”

Timothy B. Verified Customer

12/5/2018

Course was well detailed to provide a good explanation of tasks involved.

“Course was well detailed to provide a good explanation of tasks involved.”

Richard J. Verified Customer

Added to Cart! Click here to view your cart.